China store can net dispatch: Recently, wind of Shandong of dragon source electric power store project and project of side of user of blessing boast Shanghai are released early or late store can the system wins the bid result, win the bid unit price is in 1.3-1.5 yuan / between Wh.
Rise in price with continual batteries and carbonic acid lithium those who form contrast is, recently store can the price that the system carries did not appear to rise apparently, participate in square ceaseless grow in quantity, competition the main reason that intense with each passing day likelihood is this backside.
Shu wind is faced in Shandong store in the project, this two handed down from the older generations of the family unite Jin Feng, distant view line wind report is overall the manufacturer is in store can encounter again in systematic contest mark and be the same as a fight closely, also highlighted in wind report + store can below big setting, fan manufacturer strive is extended store can report of wind of professional ability, implementation store can the trend that unifinication equipment supplies.
Wind-force of Linyi of source of dragon of dragon source electric power generates electricity limited company
Shandong faces Shu 3 period wind store project
Wind-force of Linyi of source of dragon of dragon source electric power generates electricity limited company Shandong faces Shu 3 period wind store project, 76.5MW of wind report dimensions, store can equipment purchases dimensions 15.3MW/30.6MWh, store can configure scale 20% , when discharging continuously, grow 2 hours.
The announcement of invite public bidding that early days issues shows, this purchase limits to include:
Store can systematic batteries and store can the system is compositive and all of equipment purchase with supply.
Store can the installation of systematic equipment is debugged reach with all electric equipment inside step up station receive.
Announcement of additional invite public bidding shows, after this project date of delivery is signed for the contract 30 days (specific time decides in contract negotiation) .
Win the bid candidate result is expressed as follows.
Blessing boast group (Shanghai) automobile glass limited company
User side store can project
Blessing boast group (Shanghai) the sources of energy of contract of side of user of automobile glass limited company manages store can project, chu Nengrong measures 7.5MW/22.5MWh.
The announcement of invite public bidding of early days shows, win the bid the person needs to finish:
Project design, equipment is purchased with complementary material, debug, try move.
Win the bid to show as a result, the time limit for a project of this project / date of delivery / service period is 60 days.
Win the bid the result that pick a person is expressed as follows (among them the 2nd, the 3rd win the bid candidate quote was not announced) .